Mechanical Contractor: W.E. Bowers, Inc.
Mechanical Engineer: Kling Stubbins, Washington, D.C.
General Contractor: Clark Construction
Owner: GSA
Buildings 52, 62 and 72 are home to the Center for Devices and Radiological Health (CDRH) and the Center for Biologics Evaluation and Research (CBER) at the FDA’s White Oak Campus. This multi-building project consolidated many different FDA sites onto the White Oak Campus. Metropolitan Equipment Group was instrumental in design process as well as providing on-site technical resources to provide state of the art wet chemistry laboratories, vivariums, BSL2 and BSL3 spaces.