Park Center 1

Accommodate load challenges and achieve high integrity, efficiency

Owner: COPT, Engineer: TAI

The owner has a preference to the Nailor fan powered devices due to their extensive life span, superior controllability and the service aspect of MEG offers. The project was designed around a fan powered chilled beam concept that decouples the sensible and latent loads while achieving industry leading efficiencies. The design also included Nailor’s high performance horizontal fan coils for zones such as fitness centers and kitchen areas that had higher latent loads, which made decoupling sensible and latent loads challenging. The fan coils allowed the consultant to accommodate the load challenges while maintaining system integrity and efficiency.

Share